İSTAÇ, Şile MBR + NF Leachate Treatment Plant Capacity Extension Project
The Sile LTP plant is manufactured for Istanbul Metropolitan Municipality, Istaç A.S. at Sile Solid Waste Landfill. The flow of the plant is 1200 m3/day. The leachate COD is about 15.000 mg/lt and the TKN is about 3000 mg/lt. MBR and Nanofiltration technology is selected to treat the lanffill leachate. The discharge of the LTP is suitable for river limitations.